XLerate is Save on Energy's pay-for-performance program for large electricity projects. Industrial, municipal, institutional and healthcare facilities whose projects save at least 600 megawatt-hours a year earn $300 per megawatt-hour of verified savings, up to 75% of project costs and $15 million per project, plus 50% cost-sharing on the feasibility study.
For the big projects: chillers, process systems, compressed air and whole-plant upgrades, paid on measured savings.
Reviewed by Adam Polakow, Managing Director · Checked
Engineers and Certified Energy Managers
Registered Energy Advisors (Natural Resources Canada)
4.9★ on Google · 186 reviews
Based in Aurora · serving buildings across Canada since 2020
Authorized partner of Peak Energy
The terms
$300 per megawatt-hour
Paid on verified first-year electricity savings.
Up to 75% of project costs
To a maximum of $15 million per project.
50% of the feasibility study
Cost-shared, so the business case is partly funded before you commit.
600 MWh a year minimum
About 600,000 kWh of savings: a large plant, campus, hospital or municipal facility.
Who it is for
Non-residential facilities in the industrial, municipal, institutional and healthcare sectors. Typical projects: chiller plant replacement, compressed air systems, process cooling and heating, large motor and drive upgrades, and whole-facility controls. Smaller projects fit the Retrofit Program instead.
How it works
Feasibility study to define the project and its expected savings, cost-shared at 50%.
Application and agreement with Save on Energy, including a measurement and verification plan.
Build the project.
Measure the savings against the baseline. At least 50% of the anticipated savings must be achieved.
Incentive paid on verified savings.
Gas savings in the same project can also qualify for Enbridge Gas incentives; we prepare both so nothing is left on the table.
Sources: Save on Energy: XLerate. Program details change; we confirm current rules before you commit.
Common questions
Who qualifies for XLerate?
Non-residential facilities in the industrial, municipal, institutional and healthcare sectors in Ontario, with a project expected to save at least 600 megawatt-hours (600,000 kWh) of electricity a year.
How much does XLerate pay?
$300 per megawatt-hour of verified first-year savings, up to 75% of eligible project costs, to a maximum of $15 million per project. Feasibility studies are cost-shared at 50%.
How is the incentive paid?
On verified savings, measured under a measurement and verification plan. The project must deliver at least 50% of its anticipated savings to be paid.
Where does Next Level fit?
We scope the project, prepare the feasibility study and the measurement and verification plan, and produce the savings reports the program pays on.