New house permit in Ontario: the energy and HVAC documents checklist

Incomplete applications are the most common reason a permit stalls. Here is what most GTA building departments expect on the energy and mechanical side.

AT A GLANCE

  • Energy: an Energy Efficiency Design Summary showing how the house meets SB-12 (Ontario's energy efficiency standard for new houses)
  • Mechanical: heat loss calculations, a ventilation summary and plans showing equipment, ducts and registers
  • Designer: the designer information form for whoever prepared each document
  • Always check your municipality's own submission list

Energy efficiency (SB-12)

  • Energy Efficiency Design Summary form, prescriptive or Performance Path version, for every Part 9 house
  • Prescriptive path: the compliance package chosen, with insulation, windows, heating and hot water equipment matching the drawings
  • Performance Path: the energy model report showing the house performs at least as well as the reference package
  • If the model relies on airtightness better than 3.0 ACH50 (air changes per hour at 50 pascals) (detached) or 3.5 ACH50 (attached), plan the blower door test now
  • Window and door performance (U-value or Energy Rating) noted on the drawings or schedule

Heating, cooling and ventilation

  • Heat loss calculations, room by room, and heat gain where cooling is installed
  • Ventilation design summary for the principal exhaust and supply, including HRV or ERV where used
  • Mechanical plans for each floor: equipment location, duct and trunk sizes and routes, supply and return registers
  • Equipment sized to the calculations, not to the previous house

Designer information

  • Schedule 1: Designer Information for each designer, with their BCIN where qualification is required
  • Names on the forms match whoever actually prepared the energy and HVAC (heating, ventilation and air conditioning) documents

Common reasons applications come back

  • The design summary doesn't match the drawings (a different window, furnace or insulation value)
  • Heat loss done for the whole house instead of room by room
  • Ducts or registers missing from one floor's plan
  • Performance Path chosen, but the energy model report isn't attached

We prepare the SB-12 compliance, energy model, heat loss and ventilation documents as one package, typically in 5 business days. See SB-12 compliance reports or send us your plans.

Sources: Ontario: SB-12 Energy Efficiency for Housing · Town of Whitby: documentation required for new houses · City of Brampton: HVAC permit package · City of Toronto: Energy Efficiency Design Summary (prescriptive).

Quick answers

What energy documents does an Ontario house permit need?

An Energy Efficiency Design Summary showing how the house complies with SB-12, prescriptive or Performance Path, plus a Performance Path energy model report where that path is used.

What HVAC documents are needed?

Typically heat loss (and often heat gain) calculations, a ventilation design summary, and plans showing equipment, ducts and registers, with the designer information form for whoever prepared them.

Are requirements the same in every city?

No. Each building department sets its own submission list, so check your municipality's checklist before you apply.

  • Engineers and Certified Energy Managers
  • Registered Energy Advisors (Natural Resources Canada)
  • 4.9★ on Google · 186 reviews
  • Based in Aurora · serving Ontario builders since 2020

KEEP READING

More guides