An SB-12 (Ontario's energy efficiency standard for new houses) compliance report shows a new Ontario house meets the Building Code's energy efficiency requirements, either by matching a prescriptive compliance package or by Performance Path energy modelling. Houses with windows over 22% of above-grade wall area must use the Performance Path.

The paperwork your permit needs, and often a cheaper way to build: modelling lets you trade features instead of paying for every prescriptive line item.

  • Certified Energy Managers
  • Registered Energy Advisors (Natural Resources Canada)
  • 4.9★ on Google · 186 reviews
  • Based in Aurora · serving Ontario since 2020
  • Authorized partner of Peak Energy

Three ways to comply

RouteHowBest for
Prescriptive packageMatch every component to one compliance package for your climate zone and heating systemStandard designs with modest glazing
Performance PathEnergy model shows the design meets the required performanceCustom homes, glazing over 22%, cost optimization
Other acceptable methodsENERGY STAR for New Homes (Version 12.6) or the 2012 R-2000 StandardBuilders marketing efficiency; buyers claiming CMHC Eco Plus

The glazing thresholds

  • Up to 17% of above-grade wall area: a prescriptive package applies as written
  • 17% to 22%: a package can be used with upgraded window performance
  • Over 22%: the Performance Path is required

Climate zone matters too: Zone 1 covers areas below 5,000 heating degree days, including the GTA; Zone 2 is 5,000 or more.

What we deliver for permit

  1. Plan review and a recommendation on the cheapest compliant route.
  2. Energy model for Performance Path projects, with the trade-offs explained.
  3. Energy efficiency design summary completed for your building department.
  4. Testing: blower door tests where the design relies on airtightness.

Background: SB-12 Performance Path vs prescriptive. Builders: see all our new construction services.

Common questions

What do I submit for SB-12 at permit?

Your building department's energy efficiency design summary, with either the prescriptive package selected or the Performance Path energy model results, depending on the route you choose.

When must I use the Performance Path?

When windows and glass doors exceed 22% of the above-grade wall area. Between 17% and 22%, a prescriptive package can still be used with upgraded windows.

Does the Performance Path need a blower door test?

Yes, when the design depends on airtightness below 3.0 ACH50 (air changes per hour at 50 pascals) (detached) or 3.5 ACH50 (attached); the test verifies it during construction.